DI-Water Booster

Electrolyser testing requires refilling of process loops with electrolyte. Trending research aims for high pressure systems to eliminate the need for a first stage H2 gas compression system.

DIBooster

Our di-water booster system can feed several electrolyser test stations.

- 1 - 8 barg di-water supply required

- 10 - 80 barg di-water outlet pressure

- 230V 16 A electrical power

- continueous resistivity measurement

DIBooster02

Telegram下载旺旺商聊Banana财务Telegram中文版Telegram官网有道翻译下载有道翻译官网易歪歪有道翻译